Skip to content

Sanborn map, Oct. 1914. Library of Congress, Geography and Map Division, Sanborn Maps Collection

High Street · No. 258 · NWB.1495

258 High Street

From the state inventory · not yet researched

Built Since 1945National Register district
Built, per inventory
c. 1950
Style, per inventory
Colonial Revival
Use, per inventory
Single Family Dwelling House
Neighborhood
High Street District
MACRIS
NWB.1495 ↗

Not yet researched

Nobody has looked into this building for oldnbpt.com yet. What this page shows is the Massachusetts Historical Commission's inventory record, whose dates are estimates that cluster on round years; the map above places it on the newest fire-insurance map that covers its block.

Know something about this building: who built it, when, or what stood here before? Send a note to @newburyportarchitecture, or read the full inventory form at MACRIS ↗.

Planning work on this building?

Reviews that may apply

Newburyport Historic District (National Register, listed 1984), not contributing (built after 1930) in the 1984 nomination · Demolition Control Overlay District (DCOD) · Parcel 53-16 · Zone R2

  1. Zoning Board of Appeals not involved

    In the DCOD, but listed as an intrusion (built after 1930) in the 1984 nomination, so the DCOD special permit for demolition does not apply. The demolition delay ordinance still does, on the age test below.

    Zoning Ordinance §XXVIII-D.3 ↗

  2. Newburyport Historical Commission decides whether to impose a delay

    Built c. 1950, so 75 or more years old: removing more than 25% of its exterior walls, changing the roofline (pitch, towers, cupolas, anything projecting above the roof), moving it, or adding a dormer that misses the setback and pitch rules is "demolition" under the demolition delay ordinance. The Commission holds a hearing within 30 days and may impose a delay of up to 18 months. Parts of the building documented as younger than 75 years are excluded on a written determination by the Zoning Administrator.

    Code of Ordinances ch. 5 art. X, §§5-307–5-308 (June 2026) ↗

  3. Zoning Administrator first stop

    Every project starts with a zoning determination from the Zoning Administrator, which says which of these reviews apply and whether the work also needs zoning relief (a special permit for a non-conformity, or a variance). Fees, forms and filing deadlines are on the City’s site.

    City flowchart, June 2026 ↗

Not legal advice, not an official City publication, and not the position of the Historical Commission or any board. Says what the ordinances say as of September 30, 2026; the Zoning Administrator decides what applies. Boundaries: Merrimack Valley Planning Commission / City of Newburyport GIS (MIMAP); 1984 status from the National Register nomination's district data sheets. City's quick guide to the DCOD and demolition delay ↗ · Do I need approval? Project by project →

Sources

  1. Massachusetts Cultural Resource Information System, NWB.1495 (MassGIS copy of the inventory: name, date, style, use and location)