Re-roofing on the same shape is rarely reviewed. Changing the shape of the roof is, almost everywhere: on an older building the demolition delay ordinance treats a roofline change as demolition even when no wall comes down.

Last reviewed against the ordinances September 30, 2026

Or read the part for your area: Fruit Street district · Downtown · Rest of the historic district · Elsewhere in the city

Your building is here

Fruit Street Local Historic District

Fruit Street and a few neighboring lots on High and Prospect Streets, sixteen buildings in all. Its own commission reviews any exterior change seen from the street.

  1. Fruit Street Historic District Commission decides

    A change to the roof seen from the street, its shape, material or features, is reviewed. Before any building or demolition permit, you need one of three certificates: of appropriateness (the work suits the district), of non-applicability (nothing reviewable is involved), or of hardship. The Commission decides within 14 days whether the work is reviewable, holds a hearing within 45 days, and decides within 60 days of filing; if it doesn’t act in time, a certificate of hardship issues automatically. It looks only at what can be seen from a public street, park or the river, never at interiors.

    Code ch. 16 §16-2; Code ch. 16 §§16-6–16-8; M.G.L. c. 40C

  2. Design guidelines guidance

    The 2008 guidelines ask that the roof’s shape and slope be kept and that it be re-covered in the same material and color; architectural asphalt shingles in a matching color can be approved without a hearing.

    Code ch. 16 §§16-6–16-8; M.G.L. c. 40C

  3. Historical Commission unclear

    Whether the citywide demolition delay also applies inside the Fruit Street district is not settled by either ordinance: chapter 16 requires a certificate before any demolition permit, and the delay ordinance has no carve-out for the district. Ask the Zoning Administrator.

    §5-308(A)–(G); ch. 2 §2-103; Zoning §XXVII-C.3 and §XXVIII-C.3 (the carve-outs); Code ch. 16 §§16-6–16-8; M.G.L. c. 40C

Your building is here

Downtown Overlay District (DOD)

The downtown part of the Newburyport Historic District. The Planning Board reviews work on historic buildings and all new construction.

  1. Zoning Administrator determines

    Re-roofing in the same material and color is ordinary maintenance and excluded.

    Zoning §XXVII-D.2, 13; Zoning §XXVII-C.3, §XXVII-E; §X-H.5

  2. Planning Board decides

    A change of roofing material, a new dormer, skylight, roof deck or rooftop equipment, or removing a chimney on a historic building is an alteration. On a historic building (individually listed on the National Register, or contributing in the 1984 nomination), this needs a Downtown Overlay special permit before any building permit, judged against the Secretary of the Interior’s Standards. Before applying, the owner gives the Historical Commission photographs, the inventory forms and the plans at least 30 days ahead; the Commission sends the Board an advisory report.

    Zoning §XXVII-D.8, §XXVII-F.7; §XXVIII-D.3, §XXVIII-E.7; Zoning §XXVII-D.2, 13; Zoning §XXVII-C, E, F; §X-H.7–8; Zoning §XXVII-F.4.b–c, F.5.a.iii; ch. 2 §2-104

  3. Design rules what the Board looks for

    Dormers meet the same setback, height and pitch tests as the dormer exemption elsewhere in the city, and the Board consults the Cambridge dormer guidelines (1996); skylights lie in the plane of the roof; historic chimneys are kept.

    §5-308(H); Zoning §XXVII-F.5.g.iv–viii; Zoning §XXVII-C, E, F; §X-H.7–8

  4. Zoning Administrator determines

    Downtown review doesn’t reach everything. Excluded, on a written determination: ordinary maintenance or replacement in kind (no change in design, material or appearance; a new paint color counts as in kind); work on a building or feature that isn’t historic; and alterations (not demolition, not new construction) of a one- or two-family house whose lot is in one of the residential (R-1, R-2, R-3) pockets downtown. Work excluded from downtown review falls under the demolition delay ordinance instead, if it is “demolition” of a building 75 or more years old.

    Zoning §XXVII-C.3, §XXVII-E; §X-H.5

Your building is here

Demolition Control Overlay District (DCOD)

The rest of the Newburyport Historic District, outside downtown and Fruit Street. The Zoning Board reviews major demolition of contributing buildings; the Historical Commission keeps roof changes.

  1. No historic review not reviewed

    Re-roofing on the same shape is not reviewed. Equipment out of sight of any public way is excluded.

    §5-307 exclusion (i); Zoning §XXVIII-D.2, E.1; §5-307

  2. Historical Commission decides whether to delay

    The DCOD leaves roof work to the Historical Commission, whether or not the building was contributing in 1984. On a building 75 or more years old (100 for an accessory building), any change to the roofline counts as demolition under the demolition delay ordinance, even if no wall comes down: a change of pitch or ridge, adding or removing a tower or cupola, a dormer that misses the setback rules below, or anything without a roof (a deck, a widow’s walk, a chimney, a railing) that rises above the roof or sits within 3 feet of the edge of a flat roof. Hearing within 30 days; a delay of up to 18 months if the Commission finds the building preferably preserved.

    Code of Ordinances ch. 5 art. X §5-307; §5-307; Zoning §XXVIII-C.3; art. X; Zoning §XXVIII-C.3, E

  3. No review exempt

    A dormer (or a roof deck set into the roof) is exempt from the demolition delay if it meets every one of these: set back at least 1 ft 6 in from the wall below where it runs parallel to the ridge, and at least 3 ft 6 in from a wall below that runs across it; no higher than the ridge; not a flat roof (a shed dormer’s pitch can vary; a gabled dormer matches the main roof, except on a gambrel or mansard); and no windows in its side walls. Miss one and it is a roofline change.

    §5-308(H); Zoning §XXVII-F.5.g.iv–viii

  4. Note unsettled

    The City’s quick guide says that when a project already needs a DCOD special permit, the Zoning Board also takes over its roofline changes. The ordinance itself keeps roofs, roof pitch and dormers with the Historical Commission, with no exception. Ask how the two are being run together.

    Zoning §XXVIII-C.3; art. X

Your building is here

Everywhere else

Outside Fruit Street and the two overlays: most of the city, and a few lots at the edges of the historic district. Only the citywide demolition delay ordinance, for buildings 75 or more years old.

  1. No historic review not reviewed

    New roofing on the same roof shape is not a roofline change. Antennas and other mechanical equipment out of sight of any public way (on the rear slope, say) are excluded outright.

    §5-307 exclusion (i)

  2. Historical Commission decides whether to delay

    On a building 75 or more years old (100 for an accessory building), any change to the roofline counts as demolition under the demolition delay ordinance, even if no wall comes down: a change of pitch or ridge, adding or removing a tower or cupola, a dormer that misses the setback rules below, or anything without a roof (a deck, a widow’s walk, a chimney, a railing) that rises above the roof or sits within 3 feet of the edge of a flat roof. Hearing within 30 days; a delay of up to 18 months if the Commission finds the building preferably preserved.

    Code of Ordinances ch. 5 art. X §5-307; §5-307; §5-308(A)–(G); ch. 2 §2-103; Zoning §XXVII-C.3 and §XXVIII-C.3 (the carve-outs)

  3. No review exempt

    A dormer (or a roof deck set into the roof) is exempt from the demolition delay if it meets every one of these: set back at least 1 ft 6 in from the wall below where it runs parallel to the ridge, and at least 3 ft 6 in from a wall below that runs across it; no higher than the ridge; not a flat roof (a shed dormer’s pitch can vary; a gabled dormer matches the main roof, except on a gambrel or mansard); and no windows in its side walls. Miss one and it is a roofline change.

    §5-308(H); Zoning §XXVII-F.5.g.iv–viii

Wherever the building is

  1. Zoning Administrator first stop

    Every project starts with a zoning determination. The Zoning Administrator says which of the reviews on this page apply to your building and your plans, and whether the work also needs zoning relief. The site can tell you what the ordinances say; only that determination tells you what applies.

    §5-308(A); Flowchart

  2. Holder of a preservation restriction consents

    If a preservation restriction is recorded on the property, whatever it covers needs the holder’s consent, on top of everything else here. The City lists the restrictions it holds; the building pages on this site say when the state inventory records one.

    M.G.L. c. 184 §§31–33; the recorded restriction

Repair first