This house is one of the fine Federal mansions built on High Street during the early years of the nineteenth century when Newburyport’s mercantile interests prospered. The house has the typical Federal form of three stories with hipped roof and small square windows in the third story.
Most of the house’s architectural details are simple. These include the classically inspired cornice, window lintels and cornerboards. The door itself is flanked by sidelights and surmounted by an elegant semi-elliptical fanlight containing delicate tracery. The entrance portico has a flat roof with classical entablature supported by pillars of the Doric order.
This parcel of land at the corner of High and Broad Streets was purchased in two lots by Stephen Toppan in 1797 and 1799. Toppan was a housewright and he was involved in the building of several of Newburyport’s most important buildings. These included the Town Hall at the corner of State and Essex Streets and the original St. Paul’s Church built in 1809.
Stephen Toppan built this house prior to 1805 when it was sold to Jacob Greenleaf, a mariner. In 1807 John Pettingell purchased the house although Greenleaf, married to Pettingell’s daughter continued in residence. Pettingell was a prominent citizen who also had mercantile interests. He was the owner of the Brig Hazard, fitted out during the Revolutionary War. He was also one of the original incorporators of the Newburyport Turnpike Corporation organized in 1803 to build a toll road from Newburyport to Boston.
In 1827 Pettingell’s will left the house to the Greenleaf’s during their lifetimes after which it was to pass onto Pettingell’s grandchildren. In 1854 the house was sold to Capt. John H. Spring, a merchant. In 1876 the house was sold to Joseph Cartland. Cartland was a member of the Society of Friends and his wife, Gertrude, was a relative and dear friend of John Greenleaf Whittier.
Planning work on this building?
Reviews that may apply
Newburyport Historic District (National Register, listed 1984), contributing in the 1984 nomination · Demolition Control Overlay District (DCOD) · Parcel 56-37 · Zone R2
Zoning Board of Appeals decides
Listed as contributing in 1984, so removing more than 25% of its exterior walls, counted cumulatively since 2014 and including walls enclosed by an addition or openings filled in, needs a DCOD special permit; the Board may grant one only if the building retains no substantial remaining market value or reasonable use. The Historical Commission sends an advisory report. Replacing siding, or windows and doors in their openings, does not count.
Newburyport Historical Commission decides whether to impose a delay
Built c. 1800, so 75 or more years old: removing more than 25% of its exterior walls, changing the roofline (pitch, towers, cupolas, anything projecting above the roof), moving it, or adding a dormer that misses the setback and pitch rules is "demolition" under the demolition delay ordinance. The Commission holds a hearing within 30 days and may impose a delay of up to 18 months. In the DCOD the wall test goes to the Zoning Board instead; the Commission keeps roofline, roof pitch and dormer work. Parts of the building documented as younger than 75 years are excluded on a written determination by the Zoning Administrator.
Code of Ordinances ch. 5 art. X, §§5-307–5-308 (June 2026) ↗
Zoning Administrator first stop
Every project starts with a zoning determination from the Zoning Administrator, which says which of these reviews apply and whether the work also needs zoning relief (a special permit for a non-conformity, or a variance). Fees, forms and filing deadlines are on the City’s site.
Not legal advice, not an official City publication, and not the position of the Historical Commission or any board. Says what the ordinances say as of September 30, 2026; the Zoning Administrator decides what applies. Boundaries: Merrimack Valley Planning Commission / City of Newburyport GIS (MIMAP); 1984 status from the National Register nomination's district data sheets. City's quick guide to the DCOD and demolition delay ↗ · Do I need approval? Project by project →
Sources
- Massachusetts Cultural Resource Information System, NWB.50
- Biff Bouse, Instagram post (@newburyportarchitecture), 2020-03-22